In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session. The scenario concept in Infor LN replaces… […]
Infor Product: Infor LN Baan Tips
Baan/LN Tip of the Week: Data Sizing Moving to LN
The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume. Set… […]
Read More… from Baan/LN Tip of the Week: Data Sizing Moving to LN
Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items
If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse. When running the SIC plan, be sure to set the Order System to “MPS to MRP”… […]
Read More… from Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items
Baan/LN Tip of the Week: Differences Between Constraint Planning in Baan IV and Enterprise Planning in LN
In Baan IV, a distinction is made between the actual ERP system and a separate planning tool which contains the Constraint Planning package. This tool was intended to work with any ERP system, not just with Baan IV. The Enterprise Planning package is now considered to be a package like any other package in Infor… […]
Baan/LN Tip of the Week: Setting Up New Employees in LN
In LN, the People package is used to register the employee’s hours and expenses. To support the People package, the Employees – General (tccom0101m000) session only contains the general employee data. The title of the Employees – General (tccom0101m000) session was changed to Employees – General (tccom0101m000). From the Employees – General (tccom0101m000) session, users… […]
Read More… from Baan/LN Tip of the Week: Setting Up New Employees in LN
Baan/LN Tip of the Day: Virtualization
The advantages of virtualization include the following: • You get more out of your existing resources. Pool common infrastructure resources and break the legacy “one application to one server” model with server consolidation. • You can reduce datacenter costs by reducing your physical infrastructure and improving your server to admin ratio. Fewer servers and related… […]
Baan/LN Tip of the Week: Inventory Valuation
54705 Rate this article: No rating […]
Read More… from Baan/LN Tip of the Week: Inventory Valuation
Baan/LN Tip of the Week: Default Order Frequency
In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for… […]
Read More… from Baan/LN Tip of the Week: Default Order Frequency
Baan/LN Tip of the Week: Safety Time
You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time). The safety time is on form 4 of the item master in Baan IV… […]
Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance
In Baan IV, the order balance amount always includes the tax amount. Consequently, the tax amount must be recalculated every time an order line is modified in order to update the balance correctly. If the tax provider is activated, this requires an API call for every re-calculation of tax. In Infor LN, users can select… […]
Read More… from Baan/LN Tip of the Week: Optionally Include Tax Amounts In Order Balance