Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
53018 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Want to ensure that you have the materials you need when you need them?Want to gain insight into your ability to fulfill current and future orders timely? 

Consider implementing a method of evaluating your suppliers. A good understanding of your suppliers’ capabilities and past performance allows you to better plan and deliver orders on time to your customers. 

Some ERP systems have built in features to track supplier performance data. Reports can also be written to gather the information you need.  By whatever means you can achieve it, getting those results could be eye opening and very meaningful to your business.

First95969798100102103104Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories