Baan/LN Tip of the Week: When More = Less

Do you have bottlenecks in your process due to product changeovers or breakdowns?

Maybe the answer is adding redundancy in the department where you are experiencing the problem. A duplicate machine setup can allow for double the capacity during high production periods. It can also eliminate the need to swap out tools or other materials due to different production runs. When breakdowns occur, equipment can be swapped out to keep production moving while repairs are being made.

Planning for this keeps production levels high.

 

 

 

Optimize Your Manufacturing Today!

Previous Article Improving Efficiency in a Job Shop
Next Article BPCS/LX Tip of the Week: When More = Less
Print
31480 Rate this article:
No rating
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

If you opt to summarize transactions, do so after a period of testing so that you can be certain that all models and aliases are working to your satisfaction. When you summarize, consider ‘Summary with Detail’ because this retains the detail transactions in GLH.

Are you still using handwritten tickets for your inventory?  This method of inventory tracking is slow and prone to human error.

Putting a simple barcode system in place speeds up the process of tracking inventory movements, reduces the likelihood of mistakes, and creates a recorded history of the who/what/where that can provide valuable insight to those who make critical business decisions for your business.

Not sure where to start? Contact us and we’d be happy to help you take the first step.

First96979899101103104105Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories