BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Previous Article Infor LN 10.4.1 Release Notes
Next Article Key Solution Strengths For Process Manufacturers
Print
39789 Rate this article:
No rating
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Finance: Cost Rollup by Effective Date
Allow the load standard cost from routing and cost rollup programs to process as of a specified effective date.  With the addition of an optional effective date parameter to prompt screens for cost rollup CST500 and load standards from routing CST600. If entered, only consider bill of material components and routing operations with effective and discontinue dates that make them effective as of the entered parameter effective date.


Operations: Outside Operation Purchase Order Include Vendor Item Number
Copy the vendor item number from the vendor quote to purchase orders created automatically from outside operations of shop orders. During the process of automatically creating purchase orders from outside operations of shop orders, copy the vendor item number from the vendor quote to the purchase order line. With this change, looking at a purchase order that was created automatically for an outside operation of a shop order, the vendor item number from the vendor quote will be visible on the purchase order line.


Technology: Group Security for ILM501 Inbound Delivery Maintenance
Add function key / action code security to control who is authorized to create/revise/delete functions in ILM501 Inbound Delivery Maintenance.  With added Group Security, managers can control which users are authorized to create, change and delete deliveries in ILM501 Inbound Delivery Maintenance.

First678911131415Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: