Infor LX / BPCS Tip of the Week: Control Date Lead Times in LX

  • Control Date Lead Times – LX provides five separate Control Date Lead Time fields so you can specify additional lead time values for Shop Orders, Purchase Orders and Planned and Firm Planned orders. Each Control Lead Time Date represents additional time (days) required at each step in the process that needs more time (Quarantine, Stabilize), that is to say, when a component is due, and when it can be used. (working with an aerospace  precision bearing manufacturer, I had to account for the QA requirement that no measurements could be taken until the parts had been “soaked” (stored) in an atmospheric controlled environment (72 degrees, and controlled humidity) for 24 hours. This requirement added one full day of lead time between each machining operation) The MPS/MRP Generation program, as well as programs that Shop Order Material Allocation records use the five control date lead times to adjust component required dates to function in the same way as the BOM Offset Lead Time.
     
  • All programs that create MRP Planned Orders, MRP Firm Planned Orders, Shop Orders, and Purchase Orders call the Control Date Calculation program (MRP515B) to establish all five control dates. A Control Lead Time Date is used to adjust the component Required Dates data in the Material Requirements file (KMR), based on planned orders for a parent, and the FMA Required Dates data, based on shop order release dates for a parent.
Previous Article Partner News: How does Infor LN fit the industries that it serves?
Next Article Why should you look at OTTO? Let’s see what an OTTO customer has to say:
Print
33528 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Seems obvious – you want real time data and you want it to be accurate. Do you have the systems in place to allow for this?

Here are 4 reasons you need a data collection system:

  1. See the differences between actuals and standards
  2. Determine the source of project overruns
  3. Prevent mis-shipments to customers
  4. Avoid unnecessary reordering of parts

An automated data collection system will analyze your current data, allowing you to efficiently optimize your manufacturing and the benefits will be huge and far reaching.

Optimize Your Manufacturing Today!

Do you have a strong relationship with your suppliers? Do they know your every need/want? No? Well, why not?  

The key to any good relationship is communication. Have you established clear and consistent communication with your suppliers? Consider establishing a way for both of you to share information with each other electronically.

A portal is a good way to achieve this. Documents can be shared, updates on deliveries can be communicated with ease, and changes that can affect both your operations and theirs can be communicated efficiently and effectively.

Optimize Your Manufacturing Today!

First105106107108110112113114Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories