Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
52966 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Cross Docking can provide significant improvements in efficiency by looking for outstanding requirements for an item (production orders, sales orders, replenishment orders) and automatically assigning the incoming item to that requirement instead of putting the item away into inventory, only to retrieve it later. Consider implementing cross-docking at your facility. 

Optimize Your Manufacturing Today!

Just a refresher on a tip I’ve shared previously from Supply Chain Technology Bulletin regarding how to attain greater inventory accuracy. I thought it would be worthwhile to share again:

  • Record data regarding your inventory as soon as the items arrive at your door / receiving dock. With information, you can make decisions. Without it, you waste money, time and effort.
  • Leverage data collection, label generation and RFID solutions to make your life easier.
  • Set inventory accuracy goals for the business and for employees.
  • Train your employees so they know what is expected of them, and how to best perform their job and therefore how best to maintain accurate inventory counts.
  • Count the inventory – and do it regularly. Find a method that works best for your employees, and for your business.

Optimize Your Manufacturing Today!

First108109110111113115116117Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories