Infor LX & BPCS Tip of the Week: Installing WebTop Over LX

If you plan to use Infor WebTop, the WebTop version 4.7 or above is required when running LX 8.4. Also, acquire and install the latest WebTop 4.7 patches from Infor Xtreme prior to running LX WebTop. WebTop 4.7 can be applied to your existing environments before you install 8.4.0. If this is completed before installing LX 8.4 then the LX install will take care of much of the Webtop server configuration automatically, including installing the LX Webtop metadata, updating WEB_ENV, and including the Webtop Platform library in the INLIBL data area as part of the environment setup. If you choose to install WebTop after the LX 8.4 installation is completed, the “Infor LX 8.4 Webtop 4.7 Configuration Guide” will guide you through all the configuration steps to set up Webtop for your LX environment.

Previous Article LN & Baan Data Collection News – A BUSY 2nd Quarter for Crossroads RMC Data Collection!
Next Article Infor LN & Baan Tip of the Week: What is Included with Infor Operating Service (Infor OS)?
Print
27933 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

Understanding: What Was Issued to the Shop Order

The shop order inquiry program provides several function keys. By using the function key for the material, the display will present what components have been issued under the issued quantity column. You are also presented with the required quantity. While viewing the quantities you may see that more was issued than what was required. Possibly there was scrap and more material was required to be issued. Perhaps there was an over issue and the balance of the material is slated to be returned to stock.

A red flag should go up if the Shop Order quantity finished is equal to the required quantity for the end item and all the components have not been issued. You may want to investigate why.

First121122123124126128129130Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last