Infor LX & BPCS Materials Tip: Unique ID Generator / Unique Sequence Number

Serial Number Unique ID Generator - The new Serial Number Unique ID Generator program (INV599B3) is used to generate a unique value that groups a set of serial numbers that should be treated as part of a single, comprehensive set of inventory transactions.

Assign Unique Sequence Number - The new Assign Unique Sequence Number program (SYS046B) is used by any program that posts an inventory transaction, that is, writes an ITH record, to assign an absolutely unique and unchanging sequence number for each ITH record about to be written. SYS046B follows these steps to create the unique sequence number: 1 Reads the Item Serialization Extension file (IME) to retrieve the last unique sequence number used 2 Increments the last unique sequence number by one 3 Updates the IME record with this incremented last unique sequence number 4 Returns this incremented last unique sequence number to the calling program.

Previous Article Infor LN & Baan Tip: Can You Backflush An Item If Estimated Quantity is Zero?
Next Article How often are you counting your inventory? Are inaccurate counts affecting your ability to satisfy customer orders?
Print
21881 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

First128129130131133135136137Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: