Infor LN & Baan Tip: What conditions must exist before changing an item's inventory unit?

Is there a procedure for changing an item’s inventory unit? What conditions must exist before it can be done?

Once inventory transactions (receipts or issues) have occurred for an item, the inventory unit cannot be changed. If only orders have been placed against the item (sales or purchase), the inventory unit can be changed if these orders are removed and the economic stock of the item is zero.

The reason that the inventory unit cannot be changed once transactions have been made is due to how transactions are recorded. The inventory transactions are recorded in units. These units are the inventory unit of the item. The inventory unit is not held in this table, however. The inventory unit is held on the item data. For example, if 5 pieces (pcs) of an item are issued and the inventory unit is later changed to pounds (lbs), there will be a mismatch in the inventory history of the item. In the past, the item was issued as pcs, and now the item master inventory unit is lbs. As the inventory unit is not date effective, the inventory has then been issued in two different units (pcs and lbs), but there is no method to recognize this difference.

Previous Article Infor LX & BPCS Tip: 4 Approaches to Customizing LX / BPCS - Preparing for a Future Upgrade
Next Article Reskilling and Upskilling Your Staff – Why You Shouldn’t Ignore This
Print
15383 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

First128129130131133135136137Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last