Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LX & BPCS: Waste in Manufacturing

What if you could eliminate waste and optimize your business for $5/day?

Crossroads MES (Manufacturing Execution System) captures all of your ERP production data and harnesses the power of that data to increase your team’s efficiency by providing the right information at the right time to the right people. 

Reducing waste enables manufacturers to save money and increase productivity.
Where is the waste happening in your processes? How often is your department spending time and resources on the following tasks?

Manufacturing:

  • Correcting repeated problems with production quality
  • Juggling manual production schedules
  • Holding up production due to delayed component deliveries
  • Constantly evaluating labor and material resource needs


Materials:

  • Correcting deliveries with missing or wrong items
  • Sending overstocked inventory back to a warehouse or other location
  • Searching for raw materials, tools, or other equipment
  • Waiting on a late delivery from a supplier


Finance:

  • Managing increasing carrying costs of inventory
  • Dealing with budget overruns on projects
  • Managing cash flow due to unnecessarily long lead times and shipment times
  • Constantly evaluating labor and material costs to get overall production costs down


Company-wide:

  • Correcting repeated problems with production quality
  • Correcting deliveries with missing or wrong items
  • Holding up production due to delayed component deliveries
  • Constantly evaluating labor and material costs to get overall production costs down

Request a demo

Previous Article Infor LX & BPCS Tip: Have you considered WebTop?
Next Article Infor LN & Baan Tip: All About Invoicing Methods
Print
17157 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

First128129130131133135136137Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories