Infor LN & Baan Tip: Why was the session "General Ledger Diagnostics Workbench" built?

Any problem noticed and solved before the period closing will reduce the time and pressure during the actual period close itself. So, the General Ledger Administrator can be assisted in his/her daily tasks by viewing and addressing any issues via the "General Ledger Diagnostics Workbench" (tfgld1590m000) session.

The general ledger administrator needs to complete the following tasks during a given fiscal period:

  • Notice, print, and solve erroneous batches that cannot be finalized
  • Notice and solve integration mapping and posting errors
  • Change GL master data for solving posting errors
  • Make sure external (wages, intergroup) and automatic (recurring) documents are posted into the General Ledger
  • Perform technical utility sessions to correct data (e.g. rebuild history, reverse entry) or reset certain statuses (e.g. batch status).
Previous Article Infor LX & BPCS Tip: How to handle “ZERO COST” items
Next Article Are you ready to maximize the benefits of Infor ERP System?
Print
14556 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

First128129130131133135136137Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: