Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: 4 Benefits to Consider - Cross-Docking

Cross Docking is the practice of immediately processing completed goods to fulfill ‘demand’ requests with minimal handling. Cross Docking automatically combines and performs Baan / Infor LN steps to fill demand and shortages at the time items are available. Shortages are sorted and filled by the oldest demand date.

Benefits of Cross Docking include:

  • Direct and indirect labor savings resulting from operational efficiencies gains
  • Increased inventory accuracy, reliable on-hand inventory information and improved data entry
  • Increased productivity
  • Increased customer retention due to faster, more accurate fulfillment

Optimize Your Manufacturing Today!

Previous Article BPCS/LX Tip of the Week: The 3 Secrets to Improving Your MO (Manufacturing Optimization)
Next Article 3 Tools For Paving The Way To A Smarter Supply Chain
Print
36918 Rate this article:
No rating
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

First128129130131133135136137Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories