Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: ERP News, Event / News, IDF

What do you get with IDF?

Infor Development Framework

What do you get with IDF?

With Infor Development Framework (IDF), you can configure your view of the application data without modifying the core application and its supportability. Included with IDF are several interfaces including:

• PowerLink – A Windows-based client for end users

• Link Manager – A Windows-based environment administration client for importing environments, starting and stopping environment, and installing Fix Patches.

• Net-Link – A browser-based client (used by LX when running with SiW)

• System-Link – A XML-based interface for processing transactions from external sources.

The IDF ISO includes several components:

• All of the above interfaces

• Enterprise Integrator – for customizing IDF components and creating new business objects

• EGLi – Enterprise General Ledger 

• CRMi – Customer Relationship Management 

If you already have IDF installed for Infor LX 8.3.x, then it must be upgraded to a level that is compatible with LX 8.4. IDF PTFs and Fix Patches are required. See the Infor LX IDF 06.03.05 Installation and Upgrade Guide for details.

Previous Article OTTO Q&A from the Director of Planning & Technology at Champion Industries
Next Article Infor LN & Baan Tip of the Week: Inventory aging analysis report
Print
26495 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The shop order release date is the date that the shop order is scheduled to be released for production.

If you want to use the backward schedule method, make sure the release date is blank and the due date is maintained.

If you maintain the quantity on the shop order and the due date is prior to the system date, the due date and the release date are the same.

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

First128129130131133135136137Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories