Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC

Manufacturing: How much time are you wasting on manual processes?

It tells us that there is a great need for a review of your manufacturing processes.

Manual processes around labor reporting, production completions, issuing of material, inspection approvals, serialization, and more can weigh down the entire shop floor team and can be the source of significant errors. Your business and your customers’ needs have changed and you are in a constant battle to keep up. It is hard to know which area to tackle first and where the greatest impact can be made.

That's where the Crossroads RMC Manufacturing Utilization Review comes in. Whether you're on an old version of BPCS or Baan, or the latest version of Infor LX or Infor LN, odds are there are aspects of Manufacturing / Production Control in the ERP system that doesn't fit your business's current strategy. Do you throw out the software and start with something new? Odds are that is overkill. Sometimes it just boils down to taking the time to understand how your current state matches up with your corporate strategy, understanding the gaps, and developing a plan to get you from point A to point B.

We have successfully helped companies transform their business in the areas of: 

  • Planning / Scheduling
  • Shop Floor Control
  • Final Assembly
  • Quality Control
  • Production Control
  • Forecasting
  • Work Centers / Routings / Bill of Materials

Our consultants have 30+ years of experience that bring about REAL change. We work at your pace and in a way that makes the most sense to your business. Our consultants can review current usage and related business processes of your entire ERP system, or a particular area like Manufacturing / Production Control, and make recommendations that will reinvigorate your ERP system and those that use it.

A utilization review can be performed 100% remotely via phone or web meeting, or in person, following safety guidelines.

Get started > with a FREE 1-hour phone assessment to determine if your business can benefit from a Manufacturing Utilization review!

Sources: McKinsey.com & productionmachining.com

Previous Article The Best Baan IV | Baan V | Infor LN Financial Reports to Analyze Company Performance
Next Article The Best BPCS | Infor LX Manufacturing Reports to Analyze Company Performance
Print
27163 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.

  • If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  • If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

First129130131132134136137138Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories