BPCS/LX Tip of the Day: LX Inventory Pallet Status Flow

Four fields in the Item/Warehouse record (IIW file) affect the disposition of the

pallet status.

 

1.  Goods Receiving Code: You define these codes in Goods Receiving Maintenance (WHM130). The codes control whether or not the stock passes through inspection, what percentage, or quantity of a delivery to inspect, and the number of quarantine days, if any.

 

2.  Inspection Zone/Inspection Location: Either the Inspection Zone or the Inspection Location must be entered on the Item/Warehouse Master Maintenance screen WHM150D2-01.

 

3.  Default Inventory Status: If the status is 0 (Received) or 1 (Inspection), the item moves from the receiving location to the inspection location in inspection status. If the pallet status is not 0 or 1 (that is, 4 (Available) or 9 (Rejected)), the pallet moves to the inspection location with the default status, but the pallet will not proceed from the Inspection location to the Putaway location. You must manually move the stock.

 

4.  Pallet Status Codes: 0 (Received), 1 (Inspection), 4 (Available), and 9 (Rejected) are the only pallet status codes reserved by the system to update and advance inventory/pallet status. To do this Warehouse Management uses the following rules:

 

·    Rejected inventory goes from receiving to a Reject (type 9) Location with a Location Type A (Rejected) in the Location Extension file (ILE) record. All inventory received into a reject location is set to a pallet/inventory status of Reject (9).

·    Inventory received by Goods Receiving (WHM510) into a Receiving Location takes on the Default Inventory Status that is in the Item Warehouse file (IIW) record.

·    If the Default Inventory Status is 0 (Received), the system places the pallet status at 0 (Received) in the Receiving Location, I (Inspection) in the Inspection Location, and 4 (Available) if moved from Inspection to any palletized location other than rejection. If moved to rejection the Default Inventory Status changes to 9 (Rejected).

Previous Article McKinsey Quarterly - Next Frontiers for Lean
Next Article Barcodes and the Small Business Manufacturer
Print
38940 Rate this article:
No rating
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

First129130131132134136137138Last

Theme picker

Tips: LN | Baan

Table Timestamp Definitions (ttadv4136m000)

Use this session to define timestamps for Infor LN tables. A timestamp is an additional column that stores the date and time of the last change for each record.

Timestamps are utilized by features like the extraction logic of CPM Enterprise Analytics. They enable CPM to perform incremental data extractions. For example, CPM can use the timestamps to extract records that were changed during the last week in a weekly extraction process.

To Create Timestamps...

Operations: To absorb the cost of cost items into specific projects, you'll need to handle them as customized items. However, cost items cannot directly be defined as customized items. Customized items must be physical, either manufactured or purchased.

That said, it's still possible to absorb cost items into a project, although indirectly. Here's how:

  1. Set Up Ledger Account: First, create a new ledger account in session tfgld0508m000 and set the type to "PCS" (project) in the operations management integrations. This account will be used for matching and approving purchase orders for cost items.

  2. Create and Activate Projects: Ensure that the necessary projects are created and set to active status.

  3. Purchasing Cost Items...