Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC

At Crossroads RMC, we pride ourselves with being in the race for the “long haul”.

24 x 7, we are here to help you keep on keeping on.

Our team of dedicated professionals has an outstanding track record of being able jump in and make a difference. We can help you build on past success, address current needs, and work in lockstep with you to ensure that you weather this storm and come out the other end ready to move forward.

The Crossroads team is able to provide on-demand resources in:

  • Manufacturing Planning
  • Warehousing
  • Finance
  • Distribution
  • Customization
  • Integration
  • Data Migration
  • Upgrades & Implementations

Our team is staffed to provide world class ERP consulting and 24x7 support services to keep your systems running and your staff operating at maximum productivity.

Our consultants are committed to your success and we look forward to working with you to get through this challenging time together.

Sincerely,

Crossroads RMC
800.762.2077

Previous Article Infor Inspire Online – Tuesday, April 21st (VIRTUAL EVENT)
Next Article Infor LN & Baan Tip of the Week: In Transit Inventory Report – LN 10.7
Print
32606 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories