As of December 31, 2021, Infor LX 8.3.3 and earlier, along with ALL versions of BPCS will move to sustaining maintenance.

What does that mean?

If you are on LX 8.3.3 or earlier, or any version of BPCS, your ERP will not be supported by Infor. NO new updates, NO new fixes, regardless of the severity of the issue.

We understand that your situation may not fall into the category of a one-size-fits-all solution, so we are here to tell you that our consultants will work with you to find a solution that works for your people and makes the most sense for your business.

Contact Frank Petrasio to discuss how the latest version of Infor LX can benefit your business. 

800.762.2077 or click here to request a free phone consultation.

Previous Article Infor LX & BPCS Tip of the Week: Fast Line Entry
Next Article Partner News - Avalara/AvaTax for Infor LX | BPCS | LN | Baan | M3
Print
36550 Rate this article:
5.0
Frank Petrasio

Frank PetrasioFrank Petrasio

Other posts by Frank Petrasio

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: