Infor M3 & Movex Tip of the Week: Views & Sorting Orders

One of the most common complaints from M3 users is that the wrong information is displayed on B (list) panels, or it is displayed in the wrong order. M3 provides a tool that allows users to personalize the display so only relevant information is seen without programming assistance from IT.

It is divided into two components:

  1. Views – Defines the column headings or information to be displayed.
  2. Sorting Orders – Defines how the display is organized and presented. It permits the filtering of the above data allowing you to eliminate the display of nonrelevant information.

The tool provides skilled users with the flexibility to retrieve data from within M3 making it more useful and user-friendly.

Previous Article Infor LN & Baan Tip of the Week: Reports to Analyze Company Performance
Next Article M3/Movex Tip of the Week: Year-End
Print
31006 Rate this article:
5.0
Frank Petrasio

Frank PetrasioFrank Petrasio

Other posts by Frank Petrasio

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last