Infor LN & Baan Tip: Deleting Records

To improve performance and reduce database growth, deleting records is highly effective. The disadvantage of deleting records is that data is no longer available. Usually, however, not all records need to be saved. For example, line activities are stored by warehouse. Normally, you do not need to keep these records. Therefore, after closing a warehouse order, line activities can be removed. The User's Guide for ERP LN Archiving and the corresponding Baan IV/V Guides describe several sessions you can use to delete old data. Other data such as items and business partners can be reviewed once in a while, after which you can delete the data you no longer need. For every order and contract table, a session is available to archive and delete old orders. In these sessions, you can specify several characteristics to select the orders to be removed, such as date or status. Run these sessions on a regular basis.

Previous Article Are ERP System Blockages Thwarting Your Progress?
Next Article Infor LX & BPCS Tip: What is IDF and how could it make my life easier?
Print
26641 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: