Infor LN & Baan Manufacturing Tip: All About Routings

The planning data for the method of manufacturing is defined in Routing. A routing consists of operations, with each operation identifying the last to be carried out in a work center and/or on a certain machine defined for a specific site.

Routings can be as follows:

  • Standard Routing - A generic routing that can be attached to multiple items
  • Item specific - A routing that is applied to one item
  • Network routing - A routing containing sequentially ordered operations and parallel operations
  • Order quantity dependent routing - A routing that is defined for a specific quantity of items

You use the Routing module to record routings for manufactured items. You can define the following:

â–ª Work centers - A work center is where production activities are performed. Resources, such as people and machines, are linked to a work center. A work center is a group of resource units used as a functional planning unit. The operation rate code, which is linked to the work center, is used to calculate the standard cost of an item or the estimated and actual costs. The capacity load on a work center is used in the planning of production. Work centers can be part of enterprise units used for multi-company modeling purposes.

â–ª Machines - Machines are linked to work centers and are used to plan operations. The rate defined for a machine is used to calculate the actual machine costs. The capacity load on a machine is used for production planning.

â–ª Reference operations - Classified according to the nature of the work performed, reference operations are used to describe activities that take place in the job shop. Reference operations are linked to operation rate codes, which are used to calculate the standard cost of an item or the estimated and actual costs. Reference operations are used in production planning.

â–ª Operations - The operation data for standard and customized manufactured items is maintained with operations. Operation data is stored and maintained for standard items and customized items. A series of operations are performed to manufacture an item. The sequence of operations is defined as a routing in operations. Yield and scrap are defined per operation.

â–ª Norm times - The run time and production rate of an operation are determined using norm tables. After a matrix is defined for two physical characteristics, such as length and width you can maintain a set of standard operation times for the X-Y coordinates. When tasks and routings are defined, the run time and production rate can be calculated by using a norm table.

â–ª Skills - Certain skills may be mandatory to perform a specific operation. To ensure employees assigned to an operation possess the necessary knowledge, skills are linked to both employees and operations.

Previous Article Infor LX & BPCS Manufacturing Tip: Backward Scheduling
Next Article Infor LN & Baan Finance Tip: What Can You Do in the Financial Statements Module?
Print
24638 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last