Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Job Management

You can use job management to schedule jobs based on your organizational requirements. For example, you can schedule jobs at non-peak hours to improve the overall system performance in a heavily loaded environment. A job consists of one or more sessions or shell commands, or both, that run without user interaction. The sessions and shell commands in a job can be started while you are not logged on to the ERP system. You can schedule jobs to start processes periodically, at a defined interval, or immediately. Typically, you use job management for print and processing sessions.

Job data  - To create a job, you must specify basic job data and link sessions or shell commands, or both, to the job. In the basic job data, you specify whether the job is periodical. For periodical jobs, you specify how the job will be scheduled.

Shared job data tables  - Typically, each company stores its own basic job data. As a result, a job runs for a particular company. However, in a job, you can also run sessions in more than one company. You can run sessions in multiple companies when the job data tables of the associated companies are physically mapped to a single main company.

Job execution - Jobs can be started in multiple ways. The job’s status defines how you can start the job. You can start the job if the job’s status is In Queue or Free.

Job history -  When the execution of a job stops, for example, when the job completes successfully or when a runtime error occurs, information is written to a history log. The job history contains information, such as the date and time of the execution and the reasons why the job and its associated session ended.

Previous Article Infor LN & Baan Materials Tip: Sales Quotations
Next Article Infor LX & BPCS Tip: PowerLink
Print
27609 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories