Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Anthony Etzel

Consulting: Methodology for Infor LX & BPCS Upgrades

Throughout the years, Crossroads RMC has participated in several 4.0.05CD upgrades to LX, from which we had the opportunity to refine our methodology for CEA (Configurable Enterprise Accounting) implementations/upgrades. As a result, we have fine tuned our overall upgrade approach and have been very successful in implementing this approach with our clients.

CEA replaces the green screen GLD module and allows for considerable flexibility in the design of the COA (Chart of Accounts).

Our approach incorporates any changes that are needed in the COA and facilitates the transfer or replacement of Profit Centers and Account Codes from BPCS to LX, building on the existing GL. Among the issues we manage is the conversion of historical GL balances.

We maximize the use of LX and CEA while minimizing the manual effort that gets you there.

Contact Frank Petrasio to discuss how we can help you:

  • Preserve what works in BPCS
  • Optimize what works in LX

with a maximum of respect for your time and budget. Learn more about Crossroads RMC Consulting>

Previous Article Infor LX & BPCS Tip of the Week: Additional Selection Criteria for Cycle Count Purge Enhancement – 8.4
Next Article How Do I Determine If MES Is Right For My Business?
Print
34332 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories