Infor LX & BPCS Tip: Inventory Stocking Levels – Warehouses, Locations and Lots…Oh My!

The Infor LX system supports 4 levels of inventory. You can view summaries of stock at each level through the Material Status Inquiry program or through reports. Below are the 4 levels:

  • Item
  • Item + warehouse
  • Item + warehouse + location
  • Item + warehouse + location + lot

The lot number level and/or container of inventory can cross multiple warehouses and locations, for example, item + lot or item + lot + container. Locations exist within warehouses. There is no limit on the number of warehouses, locations, or lots that you can assign to an item.

Multiple Warehouses
You can assign as many warehouses as needed for any item. You can designate each warehouse as allocatable, allowed for order processing, or non-MRP, not used in the MRP netting logic. This allows your business to set up staging areas and quarantined warehouses. The warehouses can be physical or logical warehouses.

Multiple Locations
You can assign as many inventory locations as needed for any item. The location number is six characters long. This allows you to define sub-locations within a location, which can be an aisle, bin, or row.

The system stores item-warehouse combination inventory and allocation data. Optionally, sales history is available by item and warehouse in sales by units for the past twelve months. Total monetary amounts of sales by warehouse are also available in year-to-date, the last twelve months individually, and previous year-to-date.

Lot Inventory
On an item-by-item basis, the system requires the input of and performs tracking of lot numbers by inventory transaction. The system supports forward and backward lot traceability. The system provides inquiries and reports for the stock, allocation, and movement of inventory by lot. The system also automatically supports shelf life, expiration date, and reject data for each lot. The system automatically uses the expiration date in this allocation logic and MRP logic.

Previous Article Need Knowledgeable ERP Staff Quickly?
Next Article Tim Baker – Infor LX User Group’s Newest Board Member!
Print
15852 Rate this article:
4.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: