Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Optimize with Infor Development Framework: IDF

Infor LX | BPCS | M3

Why You Need IDF

The Infor Development Framework (IDF) not only helps you modernize the look and feel of your LX software but also the interactions of the IBM i software with other applications in your business.

“The IDF is a multi-user interface, single codebase architecture that’s metadata-driven (and) provides a lot of flexibility to adapt the software for their processes.” says Infor. This is the direction that Infor is going starting with LX 8.3.4 covering inquiries that can replace green screen 300 series inquiries. Newer versions of LX 8.4 and above introduces master file maintenance programs with the IDF and there are no longer green screen master file maintenance programs. 

It’s a Win-Win!  - So why aren't you taking advantage of the IDF? 

  • Not installed?
  • It's installed, just not using it?
  • Not licensed?
  • Don't know how to use it?

To get you started, Crossroads RMC specializes in:

  • Installation
  • User set-up
  • Security authorization
  • Basic and advanced training
  • User navigation by replacing multiple green screen sessions
  • Creating business objects and views


To learn how the IDF and Crossroads RMC can optimize your Infor LX, ERP LX, BPCS, and M3, please contact George Moroses today!

Get a free consultation

Previous Article Infor LX & BPCS Tip: The Top 6 Benefits of CLD
Next Article Infor LN & Baan Tip: 15 Reconciliation Steps for GRNI Transactions
Print
13208 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories