Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Serialized Controlled Item >> to >> Non-Serialized Controlled item

Changing an item from serialized to not serialized can only be done by unchecking the Serialized flag in session Item - General (tcibd0101s000). 
The conditions for this are:

  • On Hand inventory is 0.00
  • On Order inventory is 0.00
  • Allocated inventory is 0.00

There are no records in the Inventory Transactions by item (whinr1510m000). Instead of removing all allocations and inventory, a new item may be created to replace the serialized item via the session Alternative Items (tcibd0505m000). Alternatively, the item can be converted from serialized in inventory to serialized not in inventory. 

In Item – Warehousing (whwmd4500m000) all the serial registration flags can be set to “No” and a Lot and Serial Registration Template (whwmd4102m000) can be linked in which all registration is explicitly excluded. In this way, although still serialized, the item is not subject to any serial registration and acts like a not serialized item.

Contact us today to learn more. 800.762.2077  | solutions@crossroadsrmc.com

Previous Article Infor LX & BPCS Tip: Support for IBM i 7.3 and Infor LX Products
Next Article Is it time to get more out of your ERP?
Print
17265 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories