LN & Baan Tip: Unlocking Efficiency: Embrace Cycle Counting for Smoother Inventory Management

When it comes to inventory management, the term "Manual Physical Inventory" might sound accurate, but it's not the best practice by any means. Instead, consider implementing "Cycle Counting" as a more efficient approach.

Why choose Cycle Counting over a full physical inventory? The key advantage is that Cycle Counting allows you to focus on counting a selected range of stock concurrently with your regular business operations. This method streamlines inventory management, minimizing disruptions to processes related to stock receiving, consumption, and dispatching.

With Cycle Counting, you no longer need to "freeze" your operations or have your staff work long hours during holidays. You can achieve accurate inventory counts throughout the year. Crossroads RMC is here to assist you in implementing Cycle Counting efficiently and seamlessly. Contact us today to get started at 800.762.2077. Say goodbye to the dreaded three words and embrace a more efficient inventory management approach!

Previous Article LX & BPCS Tip: Unlocking Efficiency and Customization: The Power of Infor Development Framework (IDF)
Next Article Explore IDF v10's Top 10 Features with Nick Olson's Presentation from inPower 2023 - Download Now
Print
14238 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories