Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip: Navigating the Complexities of Surcharges on Phantom Items in Manufacturing

Is it ok to define surcharges on phantom items?

It is advised not to use surcharges on phantom items for the following reasons:

  1. The usage of phantom surcharges makes it, in general, more difficult to understand, verify, and explain the result of the cost price calculation.
  2. Real phantom items do not exist in real life. It is only an efficient way to specify the BOM. It is therefore questionable if surcharges should be defined for these non-existing phantom items.
  3. The usage of phantom surcharges can lead to variances in production orders, depending on the actual usage of the phantom.
  4. When surcharges based on added costs are defined for both the main item and the phantom item, then the surcharge will be applied twice.

Alternatives are:

  • Define the required surcharges on the main item of the phantom.
  • Define the required surcharges on the sub-item of the phantom.
  • Define a (backflush) operation on the phantom to cover the handling costs (if any) of a phantom item.
Previous Article Infor LX & BPCS Tip: Mastering the Latest Infor LX Innovations for Manufacturing Excellence
Next Article Streamline Your Audit Process: How Crossroads RMC and Avalara Ensure Compliance and Confidence
Print
12516 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories