IDF: Defining the Attributes for a New Object

Attributes are the fields you define in your System i file.

You can begin by building your attribute list in Integrator by synchronizing the object with the host. This process reads the file definition from the System i and builds your list of attributes. The synchronize process will automatically run and read the definitions for the first occurrence of this file name within the library list. You can repeat this process manually multiple times if you change the file definition on the host by using the ‘Synchronize with Host’ option. However, the synchronization process will not recognize changed field names.

Non on key field attributes: The integrator requires a unique key for each object. If the host file already has a key, the synchronization process will automatically identify fields as part of the key as well as add a sequence number to multiple key parts. If the file does not have a unique key, you must either create a keyed logical file or identify the key manually. Key fields are the default sort order for all list views for an object.

Previous Article Why do you need OTTO? Let’s let our customers tell you…
Next Article Infor and Crossroads RMC Partner to Drive Success at Ridewell
Print
25075 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories