Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Anthony Etzel
/ Categories: Event / News, Consulting

Upgrading from BPCS 6.1 to LX 8.3

It's always great to hear nice words from our customers!

"Our upgrade from BPCS 6.1 to LX 8.3 was greatly aided by Crossroads RMC. Their extensive knowledge of the financial system was a saving grace for us since we had a system that was set up over 15 years ago by people no longer in the company. The patience and professionalism of Hugh Carty made the transition much less complicated and frustrating. There is no doubt in my mind that it would have taken a much longer period and a substantially more painful path if it was not for Crossroads RMC bending over backward to accommodate our processes and time constraints.

Crossroads RMC was also able to help us with AS400 technical training, MRP production system design, and pricing using Promotions and Deals. This large swath of knowledge was very helpful in management discussions. Thanks to the Crossroads RMC team and in particular Hugh Carty, Yupo was able to bring this implementation under budget and on time. "

Tim Knight — IS Manager, Yupo Corporation, USA

Learn More: Crossroads RMC Consulting Services

Previous Article Infor LX & BPCS Tip of the Week: Partial Search in Item Description List
Next Article The Security Model in IDF
Print
32828 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories