Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt

Do you have spreadsheets and separate databases that may or may not be tied to Baan/LN?

Do you have spreadsheets and separate databases that you’re keeping on the side that may or may not be tied to Baan/LN?

-Do you wish they were integrated so that you didn’t have to manually go into each system to report on the data or look up information? 
-Are you running into problems because you don’t have exposure to all of the data that is critical to running your business?

Crossroads RMC has a team of integration experts who can create the integration you’ve been dreaming about… AND we have developed RMCconnector to allow for quick and easy translation data from your front end system into a format accepted by your back end ERP. 

Learn More

Previous Article Baan/LN Tip: Saving Space in Your General Ledger
Next Article Does your existing data collection equipment and barcode label printers need some love and attention?
Print
30644 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–Ş Four sets of costs: actual, standard, frozen standard, and simulated

â–Ş Nine user-defined elements per set

â–Ş Full and partial cost roll-up and simulation

â–Ş Cumulative in-process cost tracking

â–Ş Cost summaries by item

â–Ş Cost definition tied to work centers or material type

â–Ş Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories