Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: ERP News, Event / News

Join us in St. Louis for inPOWER 2020!

inPower 2020

We can’t wait to see you this May at the PREMIER event for Infor LX & BPCS users! Join us for the conference and a special customer appreciation event!

Why attend?

  • Participate in exclusive training sessions
  • Attend user experience and industry presentations on topics relevant to your business
  • View new product demos to give you the tools needed to tackle issues we all share

Click here to register and please let us know that you will be attending!

Previous Article What is the right balance of KPIs to make sure your production line is running at peak performance?
Next Article Want a way to convert IBM i ® spool files into full-color, professional forms that are output as PDF documents?
Print
27411 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–Ş Four sets of costs: actual, standard, frozen standard, and simulated

â–Ş Nine user-defined elements per set

â–Ş Full and partial cost roll-up and simulation

â–Ş Cumulative in-process cost tracking

â–Ş Cost summaries by item

â–Ş Cost definition tied to work centers or material type

â–Ş Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories