Crossroads RMC and Kardex Remstar Partner to Provide Solution for L3 Electron on Infor LN

L3 Electron has selected Crossroads RMC to develop a connector from Kardex Remstar’s Power Pick Global software to Infor LN. Power Pick Global facilitates batch picking, allowing an operator to fill multiple orders at one time, increasing productivity significantly. Multi-user-picking provides the flexibility to easily add additional labor to further increase picking speeds when order volume is high. Optical indicators such as Pick-to-Light and Put-to-Light direct the operator to the exact location of the pick, increasing accuracy and reducing the number of picking errors. L3 Electron is a technology company specializing in the manufacture of microwave devices for ground-based, airborne and satellite communications and radar. Go live is scheduled for late Q3 of 2017.

Previous Article BPCS/LX Tip of the Week: Operational Inefficiencies
Next Article Blueprint for Labeling Success
Print
30022 Rate this article:
3.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: