Crossroads MES – The Shining Star of Hoffmaster’s Move to LX

When Hoffmaster finally flipped the switch on its ERP migration at the end of February, the IT director was nervous. Not only was the paper-goods supplier consolidating a manufacturing site on Infor ERP LX, but it was also replacing an old shop floor reporting system with a new one from Crossroads RMC. There was a lot that could go wrong for the IBM i shop.

"When we weighed all of our products, Crossroads RMC pretty much convinced us their product was plug and play and their integration back to LX was solid as a rock, and they were right..." the IT director says.

Click Here to Learn about Hoffmaster’s move to Infor LX and their implementation of the Crossroads MES solution.

Previous Article Are Complex, Paper-Based Processes Holding You Back?
Next Article Baan/LN Tip of the Week: What Should I Consider When Analyzing My Sales?
Print
31141 Rate this article:
No rating
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last