Four fields in the Item/Warehouse record (IIW file) affect the disposition of the

pallet status.

 

1.  Goods Receiving Code: You define these codes in Goods Receiving Maintenance (WHM130). The codes control whether or not the stock passes through inspection, what percentage, or quantity of a delivery to inspect, and the number of quarantine days, if any.

 

2.  Inspection Zone/Inspection Location: Either the Inspection Zone or the Inspection Location must be entered on the Item/Warehouse Master Maintenance screen WHM150D2-01.

 

3.  Default Inventory Status: If the status is 0 (Received) or 1 (Inspection), the item moves from the receiving location to the inspection location in inspection status. If the pallet status is not 0 or 1 (that is, 4 (Available) or 9 (Rejected)), the pallet moves to the inspection location with the default status, but the pallet will not proceed from the Inspection location to the Putaway location. You must manually move the stock.

 

4.  Pallet Status Codes: 0 (Received), 1 (Inspection), 4 (Available), and 9 (Rejected) are the only pallet status codes reserved by the system to update and advance inventory/pallet status. To do this Warehouse Management uses the following rules:

 

·    Rejected inventory goes from receiving to a Reject (type 9) Location with a Location Type A (Rejected) in the Location Extension file (ILE) record. All inventory received into a reject location is set to a pallet/inventory status of Reject (9).

·    Inventory received by Goods Receiving (WHM510) into a Receiving Location takes on the Default Inventory Status that is in the Item Warehouse file (IIW) record.

·    If the Default Inventory Status is 0 (Received), the system places the pallet status at 0 (Received) in the Receiving Location, I (Inspection) in the Inspection Location, and 4 (Available) if moved from Inspection to any palletized location other than rejection. If moved to rejection the Default Inventory Status changes to 9 (Rejected).

Previous Article McKinsey Quarterly - Next Frontiers for Lean
Next Article Barcodes and the Small Business Manufacturer
Print
40381 Rate this article:
No rating
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: