What do you get with IDF?

Infor Development Framework

What do you get with IDF?

With Infor Development Framework (IDF), you can configure your view of the application data without modifying the core application and its supportability. Included with IDF are several interfaces including:

• PowerLink – A Windows-based client for end users

• Link Manager – A Windows-based environment administration client for importing environments, starting and stopping environment, and installing Fix Patches.

• Net-Link – A browser-based client (used by LX when running with SiW)

• System-Link – A XML-based interface for processing transactions from external sources.

The IDF ISO includes several components:

• All of the above interfaces

• Enterprise Integrator – for customizing IDF components and creating new business objects

• EGLi – Enterprise General Ledger 

• CRMi – Customer Relationship Management 

If you already have IDF installed for Infor LX 8.3.x, then it must be upgraded to a level that is compatible with LX 8.4. IDF PTFs and Fix Patches are required. See the Infor LX IDF 06.03.05 Installation and Upgrade Guide for details.

Previous Article OTTO Q&A from the Director of Planning & Technology at Champion Industries
Next Article Infor LN & Baan Tip of the Week: Inventory aging analysis report
Print
26495 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

â–ª Four sets of costs: actual, standard, frozen standard, and simulated

â–ª Nine user-defined elements per set

â–ª Full and partial cost roll-up and simulation

â–ª Cumulative in-process cost tracking

â–ª Cost summaries by item

â–ª Cost definition tied to work centers or material type

â–ª Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: