1.  How difficult is it to initially install OTTO?

Dead easy is the straight answer. We relied on you to install, and you installed in the predicted 1 hour.  

2.  Would you install it on a test system or on the production system?

Production system is another easy answer. I use OTTO as the ideal prototype when talking to business contacts about “add-on” products. It is non-invasive; it only reads data from our ERP files. I know the implementation is 100% safe because no ERP files are ever updated (read corrupted) by OTTO.

3.  How difficult was it to implement OTTO? Was there a negative impact on daily operations?

There is a learning curve involved in using any new tool that has value to add. OTTO implementation is very low on the impact scale, but I would strongly recommend that a prospective client plan on investing in education and practice. OTTO implementation is low impact. No valuable tool is “no impact”.

Click here to learn more about OTTO

Previous Article Is the Crossroads Analytics Dashboard Product Better than Spreadsheets?
Next Article What do you get with IDF?
Print
23637 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut, or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center

loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The challenge in cost accounting is tracking your manufacturing to the levels needed for useful management information. You need feedback for corrective action; but, you need to minimize the cost of collection. Some parts of your operation require specific job-cost tracking while the Just-in-Time areas require

costing in terms of cost per process hour or day. Apply overhead in different ways to different processes and products. Segregate costs into enough detail

to provide management with an accurate picture of the contents of your product. Material, material overhead, labor, fixed overhead, variable overhead, outside processing, outside processing overhead, and so forth all have to be considered.

 

LX meets your cost accounting needs with the following functionality:

▪ Four sets of costs: actual, standard, frozen standard, and simulated

▪ Nine user-defined elements per set

▪ Full and partial cost roll-up and simulation

▪ Cumulative in-process cost tracking

▪ Cost summaries by item

▪ Cost definition tied to work centers or material type

▪ Process hour costing

First133134135136138140141142Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last