Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: Infor LX & BPCS Tips

Infor LX & BPCS Tip: How Items Are Selected for a Cycle Count

The Cycle Counting Sub-System Within Inventory Management

The system uses the following information as the basis for cycle counting selection:

  • Cycle Counts/Year: The system calculates the time between cycle counts based on your entry in this Item Master file field for each item (optional).
  • Last Cycle Count Date: This date is in the Location Inventory file, ILI, if you use locations, or in the Warehouse Inventory file, IWI, if you don't.

The system adds the time between cycle counts (calculated as described above) to this date. If the result is less than or equal to today's date, the item is selected for cycle counting. If it is greater than today's date, the item is not selected, it is not due yet for cycle counting.

There is another special condition that causes an item to be selected for cycle counting. If the ILI/IWI record of the item has a Y in the Cycle Flag field, the item is selected automatically. This flag indicates that the item's on-hand balance has gone to a negative value sometime since the last cycle count. That applies even if the value is not negative at selection time. The programs that can set this field are INV500D, INV510, and BIL540.

You can also limit the items selected for counting by specifying limits of the item numbers or warehouses to be searched.

Previous Article Mitigating Risk With Your Infor ERP
Next Article Infor LN & Baan Tip: Project Status Options
Print
15076 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

For years, repetitive manufacturing industries have been applying many of the principles in Just-in-Time philosophy. They have established balanced production lines that depend on a steady flow of material to each work station. They schedule production in daily or weekly rates rather than in discrete shop order lots. They track finished inventory by work center rather than by job. They typically backflush stock balances (decrement stock balances upon completion of specific manufacturing steps rather than issued at the beginning of each production run).

 

Costing is typically based upon a daily rate or hourly rate rather than being associated with specific shop orders. 

 

Repetitive manufacturers use MRP II software adaptable to their environments

in the following key areas:


â–ª Product definition

â–ª Inventory tracking

â–ª MRP/Master Scheduling

â–ª Shop Floor Control

â–ª Purchasing

â–ª Costing

Just-in-Time (JIT) is a management philosophy that focuses on minimizing the resources necessary to add value to your products and to operate your factory in ways that eliminate waste. Resources are labor, materials, equipment, space, and time. Waste is anything that does not add value to your products. Moving work-in-process from place to place, stacking and sorting, investing capital in large work-in-process and raw material inventories, inspecting materials at your vendors' sites, and tying up warehouse space with finished goods are all activities that add cost, not value, to your products. 

JIT is a process that reduces lead time. JIT does not replace an MRP, an inventory program, a scheduling technique to bypass your Master Schedule, or a materials management project. JIT is the never-ending commitment of everyone, from top management to your workers on the floor, to maximize your effectiveness through continuous, incremental improvements.

First134135136137139141142143Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories