Infor LN & Baan Tip: What conditions must exist before changing an item's inventory unit?

Is there a procedure for changing an item’s inventory unit? What conditions must exist before it can be done?

Once inventory transactions (receipts or issues) have occurred for an item, the inventory unit cannot be changed. If only orders have been placed against the item (sales or purchase), the inventory unit can be changed if these orders are removed and the economic stock of the item is zero.

The reason that the inventory unit cannot be changed once transactions have been made is due to how transactions are recorded. The inventory transactions are recorded in units. These units are the inventory unit of the item. The inventory unit is not held in this table, however. The inventory unit is held on the item data. For example, if 5 pieces (pcs) of an item are issued and the inventory unit is later changed to pounds (lbs), there will be a mismatch in the inventory history of the item. In the past, the item was issued as pcs, and now the item master inventory unit is lbs. As the inventory unit is not date effective, the inventory has then been issued in two different units (pcs and lbs), but there is no method to recognize this difference.

Previous Article Infor LX & BPCS Tip: 4 Approaches to Customizing LX / BPCS - Preparing for a Future Upgrade
Next Article Reskilling and Upskilling Your Staff – Why You Shouldn’t Ignore This
Print
15383 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

For years, repetitive manufacturing industries have been applying many of the principles in Just-in-Time philosophy. They have established balanced production lines that depend on a steady flow of material to each work station. They schedule production in daily or weekly rates rather than in discrete shop order lots. They track finished inventory by work center rather than by job. They typically backflush stock balances (decrement stock balances upon completion of specific manufacturing steps rather than issued at the beginning of each production run).

 

Costing is typically based upon a daily rate or hourly rate rather than being associated with specific shop orders. 

 

Repetitive manufacturers use MRP II software adaptable to their environments

in the following key areas:


â–ª Product definition

â–ª Inventory tracking

â–ª MRP/Master Scheduling

â–ª Shop Floor Control

â–ª Purchasing

â–ª Costing

Just-in-Time (JIT) is a management philosophy that focuses on minimizing the resources necessary to add value to your products and to operate your factory in ways that eliminate waste. Resources are labor, materials, equipment, space, and time. Waste is anything that does not add value to your products. Moving work-in-process from place to place, stacking and sorting, investing capital in large work-in-process and raw material inventories, inspecting materials at your vendors' sites, and tying up warehouse space with finished goods are all activities that add cost, not value, to your products. 

JIT is a process that reduces lead time. JIT does not replace an MRP, an inventory program, a scheduling technique to bypass your Master Schedule, or a materials management project. JIT is the never-ending commitment of everyone, from top management to your workers on the floor, to maximize your effectiveness through continuous, incremental improvements.

First134135136137139141142143Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last