Consulting: Methodology for Infor LX & BPCS Upgrades

Throughout the years, Crossroads RMC has participated in several 4.0.05CD upgrades to LX, from which we had the opportunity to refine our methodology for CEA (Configurable Enterprise Accounting) implementations/upgrades. As a result, we have fine tuned our overall upgrade approach and have been very successful in implementing this approach with our clients.

CEA replaces the green screen GLD module and allows for considerable flexibility in the design of the COA (Chart of Accounts).

Our approach incorporates any changes that are needed in the COA and facilitates the transfer or replacement of Profit Centers and Account Codes from BPCS to LX, building on the existing GL. Among the issues we manage is the conversion of historical GL balances.

We maximize the use of LX and CEA while minimizing the manual effort that gets you there.

Contact Frank Petrasio to discuss how we can help you:

  • Preserve what works in BPCS
  • Optimize what works in LX

with a maximum of respect for your time and budget. Learn more about Crossroads RMC Consulting>

Previous Article Infor LX & BPCS Tip of the Week: Additional Selection Criteria for Cycle Count Purge Enhancement – 8.4
Next Article How Do I Determine If MES Is Right For My Business?
Print
34295 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: