Infor LX & BPCS Tip: How Items Are Selected for a Cycle Count

The Cycle Counting Sub-System Within Inventory Management

The system uses the following information as the basis for cycle counting selection:

  • Cycle Counts/Year: The system calculates the time between cycle counts based on your entry in this Item Master file field for each item (optional).
  • Last Cycle Count Date: This date is in the Location Inventory file, ILI, if you use locations, or in the Warehouse Inventory file, IWI, if you don't.

The system adds the time between cycle counts (calculated as described above) to this date. If the result is less than or equal to today's date, the item is selected for cycle counting. If it is greater than today's date, the item is not selected, it is not due yet for cycle counting.

There is another special condition that causes an item to be selected for cycle counting. If the ILI/IWI record of the item has a Y in the Cycle Flag field, the item is selected automatically. This flag indicates that the item's on-hand balance has gone to a negative value sometime since the last cycle count. That applies even if the value is not negative at selection time. The programs that can set this field are INV500D, INV510, and BIL540.

You can also limit the items selected for counting by specifying limits of the item numbers or warehouses to be searched.

Previous Article Mitigating Risk With Your Infor ERP
Next Article Infor LN & Baan Tip: Project Status Options
Print
15076 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: