Infor LN & Baan Tip: What Data Can Be Archived or Deleted?

From time to time, your employees need access to information related to logistical and financial transactions that have occurred in the past. Before you archive or delete this information, you must understand the need for this information. Baan and LN contain standard archiving sessions in the major modules that tend to have a high volume of historical transactions. These sessions are designed to copy historical data to the archive company, and then delete the data from the operational company.

You have three options in archiving sessions:

  1. Archiving and deleting: Data is transferred to the archive company and then deleted in the operational company.
  2. Deleting: Data is deleted in the operational company, but not archived.
  3. Archiving: Data is transferred to the archive company, but not deleted in the operational company.

Using option 1 or 2 makes archiving irreversible. If you archive only, option 3, because you want to preview the results, the archiving can be done a number of times. Usually, in archiving sessions, you can also specify:

  • The date up to which the data must be archived.
  • If texts must also be archived.
  • If texts that already exist in the archive company must be replaced.
     

Want more detail about archiving?

Previous Article Infor LX & BPCS Tip: Can’t Select Orders for Pick Release or Pick Confirm?
Next Article Staff Augmentation: Knowledgeable ERP Staff Quickly
Print
16714 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: