Infor LN & Baan Tip: Serialized Controlled Item >> to >> Non-Serialized Controlled item

Changing an item from serialized to not serialized can only be done by unchecking the Serialized flag in session Item - General (tcibd0101s000). 
The conditions for this are:

  • On Hand inventory is 0.00
  • On Order inventory is 0.00
  • Allocated inventory is 0.00

There are no records in the Inventory Transactions by item (whinr1510m000). Instead of removing all allocations and inventory, a new item may be created to replace the serialized item via the session Alternative Items (tcibd0505m000). Alternatively, the item can be converted from serialized in inventory to serialized not in inventory. 

In Item – Warehousing (whwmd4500m000) all the serial registration flags can be set to “No” and a Lot and Serial Registration Template (whwmd4102m000) can be linked in which all registration is explicitly excluded. In this way, although still serialized, the item is not subject to any serial registration and acts like a not serialized item.

Contact us today to learn more. 800.762.2077  | solutions@crossroadsrmc.com

Previous Article Infor LX & BPCS Tip: Support for IBM i 7.3 and Infor LX Products
Next Article Is it time to get more out of your ERP?
Print
17265 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories