Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC
/ Categories: Event / News

Crenlo and Crossroads RMC Go International

Crenlo, A leading manufacturer of cab and enclosure products to protect people and electronics, has partnered with Crossroads RMC to deliver a shop floor (MES lite) solution to their facilities in the US and Brazil. Crenlo was looking for a way to ensure that each production run was complete and accurate, and their overall production efficiencies were measurable. Crossroads RMC developed a complete solution to deliver detailed proprietary work instructions to each workstation, configure production lines to fit the work to be completed, perform downtime tracking with alerts and provide web based pivot reports to view entire assemblies, compare actual to expected, view inspection failures and analyze trends week to week, month to month and year to year. This solution will be fully integrated with Crenlo’s Baan IV ERP system.

Previous Article Digital Transformation & Best Practices: Your Future Supply Chain Starts Now
Next Article April 25th 2018 -LUNCH & LEARN WEBINAR FOR Baan & LN
Print
16288 Rate this article:
No rating
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories