BPCS/LX Tip of the Week: Role-Based Security

Role-Based Security introduces role type profiles and allows combining the use of role profiles with the traditional LX user type security profile functionality. The new role type profile can be defined to allow or deny access to All Products, Attention Key, Programs, and Transaction Effects.

Facility, Warehouse, and Company securities are still defined solely by the user profile settings and are not affected by the assignment of a role. Where applicable, the role authority is displayed alongside the user authority on the security profile maintenance screens making it easy to see where there are differences in authority between the user and the assigned roles.

When users are assigned to roles, security access in LX becomes a combination of authorities granted or denied by the role plus any user exceptions. User exceptions override authorities set by the roles. A user can also be assigned to more than one role.

Optimize Your Manufacturing Today!

Previous Article Baan/LN Tip of the Week: Strategies to Issue Materials – LN
Next Article December Lunch & Learn Webinar for BPCS & LX!
Print
26806 Rate this article:
No rating
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: