Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC
/ Categories: Partner News, Event / News

Crossroads RMC and Kardex Remstar Partner to Provide Solution for L3 Electron on Infor LN

L3 Electron has selected Crossroads RMC to develop a connector from Kardex Remstar’s Power Pick Global software to Infor LN. Power Pick Global facilitates batch picking, allowing an operator to fill multiple orders at one time, increasing productivity significantly. Multi-user-picking provides the flexibility to easily add additional labor to further increase picking speeds when order volume is high. Optical indicators such as Pick-to-Light and Put-to-Light direct the operator to the exact location of the pick, increasing accuracy and reducing the number of picking errors. L3 Electron is a technology company specializing in the manufacture of microwave devices for ground-based, airborne and satellite communications and radar. Go live is scheduled for late Q3 of 2017.

Previous Article BPCS/LX Tip of the Week: Operational Inefficiencies
Next Article Blueprint for Labeling Success
Print
30022 Rate this article:
3.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories