Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Anthony Etzel
/ Categories: Infor LX & BPCS Tips

BPCS/LX Tip of the Week: How to Move From Good to Great - Manufacturing Optimization

  • Are you tracking downtime? Is it done manually, or with some type of automation or application that gathers information in real-time, or is it based upon history?
  • If you are measuring team effectiveness by shift, you know there are significant differences between them. Have you figured out why?

One of our automotive customers was experiencing significant inefficiencies and difficulties with their receiving operations. After analyzing their operation, we discovered a disconnect between how they were tracking their incoming goods and what their ERP system thought was on hand.

This disconnect created time-consuming steps to process incoming material and determine where the material was needed. The manual process slowed production, caused additional staffing needs and hindered their ability to effectively get needed material to the assembly line. They chose to implement our data collection solution to automate the process.

Since implementing the solution, receiving and moving material was quicker, more accurate and efficient. This enabled the addition of another assembly line, increasing production volume – without adding staff.

Optimize Your Manufacturing Today!

 
Previous Article Infor LN 10.5 Release Notes –Hot off the press! Get your LN 10.5 Feature/Functions info here
Next Article Tip of the Week: Ways to Manage the Pain of Losing a Key Employee Before it Ever Happens
Print
33818 Rate this article:
No rating
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories