Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: ERP News, Event / News

Infor LN & Baan Add-ons: Need a reason why you should barcode your inventory? How about 8 reasons!

Top Eight Benefits of Barcodes

Barcodes are often overlooked as a method for cutting costs and saving time. A valuable and viable choice for businesses looking to improve efficiency and reduce overhead, barcodes are both cost-effective and reliable.

Both inexpensive and user-friendly, barcodes provide an indispensable tool for tracking a variety of data, from pricing to inventory. The ultimate result of a comprehensive barcoding system is the reduction in overhead.

Knowledge Center Verified, Inc. Top Eight Benefits of Barcodes: https://verifiedlabel.com/knowledgecenter/know_barcodes.aspx 

---------------------------------------------------------------------------------------------------------------------

Crossroads RMC offers RMClabel which can be tied to any data collection system, or run stand-alone. Create barcode labels with 1D or 2D barcodes to fit your inventory and shipment needs. RMClabel runs inside your ERP system and natively understands Infor LN and Baan tables. Learn more >

Previous Article Infor LN & Baan: Data Collection
Next Article Infor LX & BPCS Tip of the Week: Trim Leading Zero
Print
28088 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories