What do you get with IDF?

Infor Development Framework

What do you get with IDF?

With Infor Development Framework (IDF), you can configure your view of the application data without modifying the core application and its supportability. Included with IDF are several interfaces including:

• PowerLink – A Windows-based client for end users

• Link Manager – A Windows-based environment administration client for importing environments, starting and stopping environment, and installing Fix Patches.

• Net-Link – A browser-based client (used by LX when running with SiW)

• System-Link – A XML-based interface for processing transactions from external sources.

The IDF ISO includes several components:

• All of the above interfaces

• Enterprise Integrator – for customizing IDF components and creating new business objects

• EGLi – Enterprise General Ledger 

• CRMi – Customer Relationship Management 

If you already have IDF installed for Infor LX 8.3.x, then it must be upgraded to a level that is compatible with LX 8.4. IDF PTFs and Fix Patches are required. See the Infor LX IDF 06.03.05 Installation and Upgrade Guide for details.

Previous Article OTTO Q&A from the Director of Planning & Technology at Champion Industries
Next Article Infor LN & Baan Tip of the Week: Inventory aging analysis report
Print
26495 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.
First137138139140142144145146Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories