Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items

If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse.

When running the SIC plan, be sure to set the Order System to “MPS to MRP” for Baan IV and to “Planned to Planned” for Baan V and LN.

Using this method you keep the parts inventory out of the production planning and in the hands of the parts warehouse planner.

Previous Article Downtime & Data Loss – How Much Can You Afford?
Next Article BPCS/LX Tip of the Week: Work Center & Machine Locations
Print
54572 Rate this article:
3.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date
First141142143144146148149150Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: