Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC

International Wire Selects Crossroads RMC For Their High Performance Conductor Division

International Wire Group, Inc. headquartered in Camden, New York is the largest bare copper wire and copper wire products manufacturer in the United States. Crossroads has been selected to evaluate the manufacturing processes within the High Performance Conductor Division of International Wire, with locations in South Carolina and Georgia. During this evaluation, Crossroads will determine the best path for streamlining the shop floor which will include data collection and labor reporting. International currently utilizes Infor LX and will be evaluating Crossroads’ MES solution as part of this project.

Previous Article BPCS/LX TIP OF THE WEEK: INVENTORY TRANSFERS
Next Article Nice-Pak Products Drives Purchasing Power With Crossroads
Print
29746 Rate this article:
No rating
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Defining the Product Routing first requires the items to be setup in the Item Master file. Other master files also need to be defined prior to creating the routing.
These include:

  • The Facility defined with a SYS program
  • The Warehouses defined with an INV program
  • Locations defined with an INV program
  • The Machines (required if using capacity planning or an MES interface) defined with an MDM program

After the above data is set up, the Department file and Work Center files can be setup in MDM. Now you are ready to define a product route.

First142143144145147149150151Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: